UGT's product was used on the Shelby Twp. on Parking Lot Expansion at the city office building located off 24 mile rd., east of VanDyke. On April 1, 2008 , UGT worked with a contractor to elevate and water seal seven manholes at this location. The task took 3 hours to complete!. That included training of the contractor. On 4/14/2008 UGT was contacted to fix or patch the joint between the extension and the cone. UGT used its Veil Safe product to perform this task. Failure in creating this water barrier would have resulted in digging up and removing the sections..
|
|