Simplicity...durability...and substantial savings. UGT grade elevation system can save about 20 to 30% over brick and concrete. The chart shows the savings you can realize using UGT vs the traditional methods in accessible or limited access sites.
Scenarios
Accessible Brick
Chimney site is accessible to the contractors without obstruction. This study looked at brick chimney construction.
Limited Access - Brick
Chimney site that limited access to the contractor. Heavy duty equipment can not be brought to the site. This study looked at brick chimney construction.
Accessible Concrete Ring
Chimney site that is accessible to the contractor. Heavy duty equipment can be brought to the site. This study looked at using concrete rings.
Limited Access - Concrete
Chimney site that limited access to the contractor. Heavy duty equipment can not be brought to the site. This study looked at using concrete rings.
Results
Assumptions:
6" rise in elevation
No water veiling application
No burden & overhead calculation
UGT Prices that were higher than current suggested retail.